March 20, 2020 Capability improvements at transonic wind tunnel leads to approximately $200,000 in savings annually An annual savings of close to $200,000 is expected after the facility checkouts of the Arnold Engineering Development Complex 16-foot Transonic Wind Tunnel, or 16T, at Arnold Air Force Base last September.By leveraging previous upgrades to the Propulsion Wind Tunnel facility’s main compressor drive,