Air Force Materiel Command   Right Corner Banner
Join the Air Force

News > Malfunctioning component delays satellite launch
 
Photos 
TacSat-3
Tactical Satellite-3 program logo. (Air Force graphic)
Download HiRes
 
Related Stories
 Launch date established for Tactical Satellite-3  - 3/25/2009
Malfunctioning component delays satellite launch

Posted 1/13/2009   Updated 1/13/2009 Email story   Print story

    


by Michael Kleiman
377th Air Base Wing Public Affairs


1/13/2009 - KIRTLAND AIR FORCE BASE, N.M. -- Officials are delaying the launch of Tactical Satellite-3 - which was scheduled to occur later in January - until repairs to a spacecraft avionics component, critical to the system's operational capability, are complete.

The Air Force Research Laboratory's Space Vehicles Directorate here administers the satellite program, known as TacSat-3. The program team is working with the manufacturer to resolve the problem.

"We're very disappointed in the delay, but the fix is necessary to assure the on-orbit performance of the satellite," said Thom Davis, TacSat-3 program manager. "Had we not discovered and corrected this problem, we would have had a potential catastrophic mission failure."

The satellite originated five years ago to address military requirements for responsible, flexible, and affordable spacecraft operating in the cosmos. It consists of three pioneering experiments: the Raytheon Company-constructed Advanced Responsive Tactically Effective Military Imaging Spectrometer hyperspectral imager; the Office of Naval Research's Satellite Communications Package; and AFRL's Space Avionics Experiment. The trio of payloads will offer real-time imagery (within 10 minutes of collection), sea-based information transmitted from ocean buoys and plug-and-play avionics to support the warfighter in keeping one step ahead of the adversary.

Project partners include AFRL's Sensors Directorate, NASA, the Department of Defense's Operationally Responsive Space office, the Air Force Space and Missile Systems Center's Space Development and Test Wing, Army Space and Missile Defense Command, Air Force Space Command, the Office of Naval Research, and the National Geospatial-Intelligence Agency.

When ready, TacSat-3's launch will occur at NASA's Wallops Island Flight Facility in Wallops Island. Va.



tabComments
No comments yet.  
Add a comment

 Inside AFMC

ima cornerSearch


Site Map      Contact Us     Questions     USA.gov     Security and Privacy notice     E-publishing  
Suicide Prevention    SAPR   IG   EEO   Accessibility/Section 508   No FEAR Act