Arnold AFB pumping station receives crucial investment
From left, Jeff Quattlebaum, cooling water system engineer with National Aerospace Solutions, LLC, (NAS); Ethan Rosenblum, a superintendent with Healtheon; and Brian A. Emmons, a NAS construction superintendent, review the operations manual for the new pump, right side of image, installed at the Primary Pumping Station for Arnold Air Force Base, Tenn., Aug. 4, 2021. NAS is the Test Operations and Sustainment contractor for Arnold Engineering Development Complex, headquartered at Arnold AFB. Healtheon, a small HUBZone contractor, was responsible for installing the new pump. (U.S. Air Force photo by Jill Pickett)
PHOTO BY:
Jill Pickett
VIRIN:
210804-F-KN521-3001.JPG
FULL SIZE:
12.51 MB
CAMERA
NIKON D850
LENS
24.0-70.0 mm f/2.8
APERTURE
63/10
SHUTTERSPEED
1/320
ISO
4000
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.