An official website of the United States government
Here's how you know
A .mil website belongs to an official U.S. Department of Defense organization in the United States.
A lock (lock ) or https:// means you’ve safely connected to the .mil website. Share sensitive information only on official, secure websites.

Arnold AFB pumping station receives crucial investment

From left, Jeff Quattlebaum, cooling water system engineer with National Aerospace Solutions, LLC, (NAS); Ethan Rosenblum, a superintendent with Healtheon; and Brian A. Emmons, a NAS construction superintendent, review the operations manual for the new pump, right side of image, installed at the Primary Pumping Station for Arnold Air Force Base, Tenn., Aug. 4, 2021. NAS is the Test Operations and Sustainment contractor for Arnold Engineering Development Complex, headquartered at Arnold AFB. Healtheon, a small HUBZone contractor, was responsible for installing the new pump. (U.S. Air Force photo by Jill Pickett)

PHOTO BY: Jill Pickett
VIRIN: 210804-F-KN521-3001.JPG
FULL SIZE: 12.51 MB
Additional Details

CAMERA

NIKON D850

LENS

24.0-70.0 mm f/2.8

APERTURE

63/10

SHUTTERSPEED

1/320

ISO

4000

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.

Graphics

Arnold AFB pumping station receives crucial investment

From left, Jeff Quattlebaum, cooling water system engineer with National Aerospace Solutions, LLC, (NAS); Ethan Rosenblum, a superintendent with Healtheon; and Brian A. Emmons, a NAS construction superintendent, review the operations manual for the new pump, right side of image, installed at the Primary Pumping Station for Arnold Air Force Base, Tenn., Aug. 4, 2021. NAS is the Test Operations and Sustainment contractor for Arnold Engineering Development Complex, headquartered at Arnold AFB. Healtheon, a small HUBZone contractor, was responsible for installing the new pump. (U.S. Air Force photo by Jill Pickett)

PHOTO BY: Jill Pickett
VIRIN: 210804-F-KN521-3001.JPG
FULL SIZE: 12.51 MB
Additional Details

CAMERA

NIKON D850

LENS

24.0-70.0 mm f/2.8

APERTURE

63/10

SHUTTERSPEED

1/320

ISO

4000

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.