An official website of the United States government
A .mil website belongs to an official U.S. Department of Defense organization in the United States.
A lock (lock ) or https:// means you’ve safely connected to the .mil website. Share sensitive information only on official, secure websites.

September marks 60th anniversary of first flight of the Valkyrie

A scale version of the XB-70 Valkyrie inlet with a full-scale YJ93 engine installed is tested in the 16-foot supersonic wind tunnel at Arnold Air Force Base, Tenn., headquarters of Arnold Engineering Development Complex, in 1962. Beginning in the late 1950s and continuing through the mid-1960s, tests were conducted at Arnold Air Force Base, Tenn., headquarters of Arnold Engineering Development Complex, in support of the XB-70 program. Only two Valkyries were built, with only one of the pair remaining. The now-retired aircraft made its first flight on Sept. 21, 1964. (U.S. Air Force photo)

PHOTO BY: U.S. Air Force photo
VIRIN: 240912-F-F3405-1002.JPG
FULL SIZE: 0.13 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.

Graphics

September marks 60th anniversary of first flight of the Valkyrie

A scale version of the XB-70 Valkyrie inlet with a full-scale YJ93 engine installed is tested in the 16-foot supersonic wind tunnel at Arnold Air Force Base, Tenn., headquarters of Arnold Engineering Development Complex, in 1962. Beginning in the late 1950s and continuing through the mid-1960s, tests were conducted at Arnold Air Force Base, Tenn., headquarters of Arnold Engineering Development Complex, in support of the XB-70 program. Only two Valkyries were built, with only one of the pair remaining. The now-retired aircraft made its first flight on Sept. 21, 1964. (U.S. Air Force photo)

PHOTO BY: U.S. Air Force photo
VIRIN: 240912-F-F3405-1002.JPG
FULL SIZE: 0.13 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.