New Tinker electrical peaking plant enables energy resilience
Col. Cisco Harris, Tinker installation and 72nd Air Base Wing commander, center left, celebrates with Sean Trauschke, OGE Energy Corp. CEO, chairman and president, center right, during a ribbon-cutting ceremony at the Oklahoma Gas & Electric Tinker Power Plant outside Tinker Air Force Base, Oklahoma, Feb. 19, 2026. Designed to provide essential power for Tinker AFB’s numerous no-fail missions, the peaking plant features two natural gas-fired combustion turbine units that can generate up to 96 megawatts, enough to power approximately 34,000 homes. (U.S. Air Force photo by Paul Shirk)
PHOTO BY:
Paul Shirk
VIRIN:
260219-F-HI919-1019.JPG
FULL SIZE:
2.67 MB
CAMERA
Canon EOS R5
LENS
RF24-70mm F2.8 L IS USM
APERTURE
4
SHUTTERSPEED
1/4000
ISO
800
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.