Oct. 21, 2019 AEDC testing efficient water line repair method When it’s possible to increase operational reliability while minimizing the cost and disruption caused by maintenance, it’s a win-win.Arnold Engineering Development Complex team members are implementing a trial run of such a solution to the problem of leaks in raw water pipes at Arnold Air Force
Aug. 16, 2019 Hill Air Force Base wins DOE award for energy efficiency The Energy Office at Hill Air Force Base earned high honors recently when the installation was awarded the 2019 Federal Energy and Water Management Award from the U.S. Department of Energy.