May 11, 2020 Environmental Assessment gives Tyndall green light to rebuild into ‘Installation of the Future’ After receiving a devastating hit from Category 5 Hurricane Michael a year and a half ago, Tyndall Air Force Base is now set to purge the last of its significantly damaged facilities and start rebuilding from the ground up. To reach this vital starting point, the 325th Fighter Wing, Tyndall Program
May 5, 2020 EPA recognizes AFCEC-led cleanup success The Environmental Protection Agency is recognizing an Air Force Civil Engineer Center environmental coordinator and his team for work they’re doing to treat contaminated water at the former Pease Air Force Base, New Hampshire.
April 29, 2020 #IAMIMSC: Roger Walton Meet Roger Walton, BRAC Environmental Coordinator with AFCEC at Joint Base San Antonio-Lackland, Texas.
April 23, 2020 $6.4 billion contingency support contract increases field assistance The Air Force recently awarded an eight-year, $6.4 billion contingency support contract to eight firms. The Air Force Contract Augmentation Program, or AFCAP, is a rapid response contingency contract tool managed and serviced through the Air Force Installation and Mission Support Center enterprise.
April 21, 2020 Virtual PMO continues progress toward ‘Installation of the Future’ Telework had always been a tool of flexibility and a privilege for Lt. Col. Shayla CantySmith. Today, due to health advisories from the recent COVID-19, telework is critical for CantySmith and the entire 25-person Tyndall Program Management Office to continue delivering the “Installation of the
April 21, 2020 Pilot study aims to save money, protect environment with fewer oil changes A simple change in Air Force oil change procedures may save the Air Force over $1 million per year, while also helping protect the environment. Current regulatory drivers require installations to analyze the oil in small engines, including generators, annually and replace the oil completely at
April 20, 2020 AFIMSC swift action enables Air, Space Force to meet COVID-19 challenges The Air Force Installation and Mission Support Center is leading the effort to keep installations mission ready as the Air and Space Force continue operations while contending with the challenges of the COVID-19 pandemic.
April 15, 2020 AFIMSC geospatial tools help commanders manage COVID-19 risk JOINT BASE SAN ANTONIO-LACKLAND, Texas – An innovative solution by the Air Force Installation and Mission Support Center’s Detachment 4 at Ramstein Air Base, Germany, is giving commanders from U.S. Air Forces in Europe and Air Forces Africa the ability to accurately assess operational risk and
April 11, 2020 AMC Airmen conduct historic first aeromedical evacuation mission using Transport Isolation System The aeromedical evacuation mission, REACH 725, marked the first operational use of the Transport Isolation System since its development during the 2014 Ebola outbreak in West Africa, and the first movement of COVID-19 positive patients aboard U.S. Air Force aircraft. AFIMSC 763rd Specialized
April 7, 2020 PMO Engineers thrive with ‘once in a lifetime’ billion-dollar rebuild The $4.25 billion rebuild of Tyndall Air Force Base may seem like an overwhelming task to some, but for three Air Force civil engineer captains at the heart of the Program Management Office, the project presents a once in a lifetime opportunity. As project managers for the PMO, and as part of the